JSW Neo Energy Bags 300 MW Wind Solar Hybrid Project from NTPC

JSW Energy's total locked-in generation capacity has risen to 16.7 GW, which includes a total locked-in hybrid capacity of 2.6 GW.

Aug 23, 2024 - 15:30
 0  0
JSW Neo Energy Bags 300 MW Wind Solar Hybrid Project from NTPC
JSW Energy's total locked-in generation capacity has risen to 16.7 GW, which includes a total locked-in hybrid capacity of 2.6 GW.

What's Your Reaction?

like

dislike

love

funny

angry

sad

wow

Subhashree Hi, This is Subhi. Welcome to my blog! I love to keep up with the latest news in healthcare, technology and media. Here you will find insightful articles that inform and interest you about the world around you. Join me as I drift between health and technology, and stay up-to-date!